Show MORGAN APPLIES FOR U. U S. S FUNDS Federal Governments Government's Conditions Conditions Con Con- for Assistance Accepted Accepted Ac Ac- by Road Engineer IS SUM SUl OFFERED Fund From Federal Treasury Treasury Treasury Treas Treas- ury Apportioned Among State Highways E. E R. R Morgan Ilor n state road engineer yesterday made requisition on tho the federal federal fed tod- eral government for tor tho the offered for tor the tho Improvement of at state highways In and and adjacent to national forest re reserves ro- ro serves seneS on condition that tho the state would duplicate tho sum appropriated by the United States After Atter numerous conferences with federal o and citizens whose homes are aro in tho the districts In which the proposed Improvements Improvement will be made tho state engineer made mado tho the toll following follow follow- owIn ow- ow In ing- ing apportionment of at th the tho money available available avail n able Io Logan Garden an City It road Amount road Amount to tobe tobe tobe be furnished h by the federal al government government govern govern- ment amount to hO furnished by state contributions ns from private sources 1000 In tho the city of at Logan will construct two t miles 9 of road rond and Garden City will build four miles independent o of state Or government government gov gov- appropriations Cove Covo Ford project proJect Twenty three miles to be bo built to cost tho government to furnish and the thc state Lasallo to the Colorado line Road line Road to extend sixteen miles Improvement to cost coat 1000 of at which tho the state and government gay gov will contribute equal portions Castle Gato-Duchesne Gato project project- four Forty miles to bo be Improved state and null United States to each e furnish one- one half halt of or tho to bo be expended Tropic Panguitch-Tropic project This project This Improvement Im Im- im- im provement t miles and the sum of ot will bo ho spent on tho the work to bo be done dono this Of Ot this sum the state and federal government will each furnish one halt Oran Ephraim project project Con Con Consists slots of at forty tort miles and will sill bo be expended In improvement tho state and government to divide tha tho costs This road connects Savior SaYler and Green River basins The Daniels canyon road extends from Heber to two sixty miles This is 18 the tho main state highway highway high high- way from Crom Provo to tho timber and forage forage for for- age sections of ot the federal reserve Only 1000 will bo spent this year In improvements tho the cost to be shared by nation and state The Fairview road connects connects con con- meets two main state highways runnIng running run run- ning north and south It also opens tho way a to the tho coal coat beds In the national national national na na- na- na forest Ten thousand dollars will be bo spent in putting this road rond Into passable condition the costs to bo ho shared by state and government Ton Ten thousand dollars will b be spent on the Cedar Duck City-Duck Lake road two Twenty miles will be Improved Tho The highway will open the government coal beds and grazing lands to ranch ranch- ors ers The expense will be bo equally borne borno by tho state and the United States |