Show PROBING DAM OAM LEAKAGE f State and College Officials Of Begin Logan Inquiry Testing of or the tho power reservoir owned b by the Utah Agricultural association association asso asso- elation above Logan to determine the tho point of or alleged leakage has bOGUn begun ac according according according ac- ac cording to word received yesterday by W. W D. D Beers Beer state engineer from C. C C. C Jacobs Jacoba engineer of ot tho water resources re rc- rc sources branch of tho the United States s geological survey Mr Ir Jacobs Jacoba said ho he hohas has two men at work now and beginning beginning begin begin- ning next week will personally supervise supervise super sUPer- vise their activities The rho tests are being mado made in accordance accordance accord accord- ance anco with the terms torms ot of a a. settlement out of oC court agreed on between the tato and tho water users o of the Logan river Tho The water Vater users had brought an action against the tho tho state on the ground that operation of ot th the the- reservoir reler with their water rights because bo bo- cause tho power reservoir leaked It is expected that tho the tests now no being made will show exactly what th the tho situation Is and arid that when the necessary necessary sary data Is la obtained tho the leakage can cnn bo be stopped slopped if it there is an any |