Show THE NAST BENTON bingham bulletin manager ike hazlegrove of the nast benton is a victim of the general activity prevailing he is waiting for lumber timbers and other materials and not only cant get them but arundle of alfalfa for the wa tarboro is long overdue at feet in on the nast Benton vein an incline shaft feet has been sunk sixty F feet and station for engine and hoist is being cut work in the has been suspended as the bin is full of first class while there are about tons of milling on the dump waiting to be hauled to dewey mill A boiler house will be built as soon as lumber can be had the new machinery will include two 60 horse power boilers a so 35 horse power engine and hoist and t two w 0 knowles sinkers with thee equipments installed mr hazleton proposes to make the nast bum this summer and he is qualified to w wake ake tha fine old property up if anyone can |