Show 9 i E L I. I I I ILL LL r Campus Change Greets Gets New Fall Term Tenn Utah Tech's main campus face has changed The colleges college's new technology building 39 million worth of classrooms and equipment is about finished It was started last winter with a groundbreaking in February Scheduled completion date is the fall of 1972 Facilities in the building include include include in in- in- in clude those for electronics drafting drafting drafting draft draft- ing and design technology architectural architectural architectural archi archi- drafting data processing physics and chemistry and the I Instructional Media Center Several Several Several Sev Sev- eral new programs are being considered for the building too The Technology Building will be bethe bethe bethe the fourth major structure on the Redwood Rd campus I In n addition a new sports field has grown in the area between the Metals and Administration Buildings I Included with the sports field is a cemented section for basketball and volleyball The field gets its debut with the flag football season soon underway A new parking lot for cars has been north of the technology building construction site Campus new looks greet 72 1971 Top changes are Technology Building construction construction construction tion and new sports field |