Show SEVEN TROUGHS flORENCE REPORT I I j Statement Shows ShO s Harrio Harric Lease Has HaD Good Prospects of Making Fu Future FuI ture tOre Shipments I Tho The Seven Scell Troughs Florence Mitt Min lug Ins Leasing company compan which has been known as the Harris lease leate on 01 the C Seven Swen Troughs Mining coin company iuan ground at Seven Troughs Nov Nev Ne has lisis just Issued d its statement under l tho lilo laws ot of Nevada The statement his has delayed Jill butt shows some sonic good developments d In the tile Tho lease of the company consists of a Il block of ground foot long stud end thOu COO feet wide on the tho Fall view liew No 1 claim und 1111 ud another block 80 feet long and aud feet feel wide on the Fair ie No 2 Relative to the lie i work ac accomplished by the company the fol tot lowing additional report has liuis been Is from Juno it IG HIO to JUlie June 30 ao 1010 1910 operatIons have ha 0 been bOen dell continuous eus ous with wilh tho exception of oC about aboul six weeks during September arid and nd October 1 09 that tho mine was closed down by direction of tile the Seven Sc lt Troughs Mining company which will willbo be bo oily fully allowed fOI tt the end etil ol of the tho I lease I ase ot The Tho 1 10 operator has liaS done as na follows Shaft Jt t oct foot o feet four Cour raises s feet foot drIfts 7 feet f el sloping 46 cubic feet feel sloping opened second antI and third levels 10 IG coo LOO cubic feet HOn On the th level In drifting north indications are law favorable fa fut for fu catching the ore body hod found on the level Icel Oh the level the drift is being andy and at al two points north of the crosscut t raising Is IB being demo for the purpose of oC prospecting tho ground above a oo this level le 1 On tho tito loyal level where most meat of the tho ore ole Is coming from rota sloping la Is vigorously at a point north of or tho the old lo to the 00 level 1 01 above Ii on a now bunch of oro ore there thero being a barren between It aud aul the tho ore already alread sloped hl From om tho the level leol a has haN boon sunk feel cot on the vein Cill and md in a Ii drift south GG 66 feet lect a streak of ol silver ore was disclosed while In lu a drift to the north 62 feet fe t hj gold oro ore about six foot feel in tn length cud and nd four Cour our inches wide was un uncovered covered r Is 1 lo to prove pr o up III the extent of or orthis this oro ore To Two rallies raises al os were w re also tio made from rom this level to o till the OO level leel and anU nn another to join up UI with the lh o from Ironi tho Prospecting at Depth Tho indications at the bottom of the tho und antI at other paris In lii the aro are encouraging and aud for tho thu purpose of further prospecting the ground at depth au an arrangement has haN bon made with the tho Seven SOen Troughs Mining company compau for tho the use lI e of ot their shaft and equipment from frow July Jill Jul 1 to December 30 1910 uno to en enable enable able The clue Operator to run a drift ou on tile the vein at the level under tIle the Florence workings g The distance In to be covered Is I about feet and the work will bo be pushed ahead eo so that tn rc will be ample lime time to lo thu t u ground and ald get seL out any an all ore thai may ma bo be o encountered In running tho the This j method m l will save myc for rol the 1 resent the expense of sinking the tho shaft and aud crosscutting to the tho vein oln t which is dipping away awn from iota tho the shaft The rho production of oC ore was waB delayed on cia account of or changes that had to be ho made malle in iii the mill of oC tile the Darby Darb No NI Novada Nevada vada Ore Reduction company where the tho ore la is I milled milieu Milling was started In April and aud up 1111 to IQ June 10 JO tons have been heen milled and nud in tons toils shipped to the Selby selb smelter at III San Sail I a which together pay payment pa ment of or tilt all II charges has lois netted n Uel the 1 company IS ISi HUt This amount la Is I ICI edited CI on Oil tho of The TIIt Oper Operator ator who wile under tinder the th walking agree agreement ment mont tins has hit lo to tt advance all nil the he J 1 fur development etc which wh leh f moil ill advanced during tile the lr rm just ended June iune 30 In Iii In Iii addition there thero arc aie about tons Ions of mill ore on the th dump and at OIl the mill milland milland I and about ab lIl tArt lOn sacks of smelting ore oro that should average bettor bethi than per Pir ton The equipment remains the same sarno as ag at al last report viz Iz A 15 l horse horsepower power gasoline hoist engine n in house blacksmith shop cars buckets tools etc eta The lease to July J 1 1912 1112 I |