Show burlington Sary yore still at work A cheyenne 4 says the report that went from ch cago to the ef feet that the burlington has withdrawn its surveying corps on the line of the proposed salt lake exten elon is not true engineers are now at work in the vicinity of gurnsey completing the surveys of the line through the lara pile mountains engineer ensign say s he b a orders to hurry tl e dvork along as contracts are to be let for the construction of the road as far as the coal fields north of rawlins at once officials here believe the company will push the line into Salt Lake as boon as possible |