Show RAILROAD BUILDING track laying laving commenced to ID real earnest on the malad valley railroad on monday at a point three miles north of garland with a large force of japs and a track laying machine it is expected that the force will everage average one mile 0 track per day there are about 18 16 miles ot of grade now ready for the track after this Is covered the material for constructing two good quod sized bridges which will span the malad river elver will be pushed to the front in order to push the construction atter after which the iron horse will make advent into the thriving city of malad |