Show sinking Is a commenced at paymaster 0 O after several days of vexatious dolay K rw at ys the gintic tintic paymaster property rf ff S of north f all the connections have aff been vwe vw made and 7 the recently installed sw ff f hoisting wr hr engine is ready for operation 7 a according to manager wy G snyder work of cutting the station on abw the aff foot level was completed J some 71 1 two weeks ago an electric hoist with a capacity of about 1200 feet a has w been installed A full ayi crew 0 says mr w snyder started waffy sinking during the I 1 guv k 0 |