Show 7 F Work on the Sanpete Valley railway railway rail rail- w way y is progressing very rapidly The new grade has been finished between Chester and Nephi and makes quite a different app appearance from Irom the old narrow narros v narro grade The new earthwork has been constructed in a solid and careful way and the grade itself in many cases has been changed to conf conform rm to broad gauge gaug railroad requirements the old grade in Salt Creek canyon being one of the in steepest in some portions of any in the state The graders are arenow now w working like beavers eavers along the road in the center of th the valley between Che Chester ter and Manti but this will this will not be such extensive work as oun coun the try is nearly level between these points President Bruback states that the two new locomotives willbe will willbe willbe be here hete by the mi middle le of the June They rhey are being built being built by the Baldwin works and are especially adapted to the work required of them on the road Auditor Pearson went down the road yesterday to get plans of a number of passenger cars needed from Superintendent Kerr who is in charge of the reconstruction work 1 The The he cars will be ordered at once Tribune |