Show I 1 DRILLING SUSPENDED AT OIL the oil well of the utah oil aal and be he fining Is s shut down for a few daye a tithing fishing conlo job b many stories are afloat as to condit loar at the well ell but indication is stat they are near pro and must prepare to taker kere take ta r ot at a large flow of ell oil before tig further there are some technicalities holding bo liling up the finishing of the and it may be some time before the company feela feels that it is ready for the final touch which will tell droher or not their hope hopes are fulfilled the crew may go a to Nv wyoming for a few week weeks to finish some work there before going further with the local well avie lavels Live lei wit over from runt tuesday ird stated that plin were being per feuel by himself and associate associates to make 1 another test of anat structure as a they are by no means too coll incel by the ohio teat test that the do not have oil the plans are yet in a amative rma tive stage A carload of ten inch casing arrild la in price the first of the week for the well ell at duchesne Du things there are pro w though a sh ut down dowa wae wax necessary while the casing was awaited |