Show MACHINERY FOR HANNAPAH Compressor and New Boiler Is Shipped to Mine MineA A compressor plant and a new return tube ei steam boiler were shipped to the Hannapah corn com party part at h Ncr Ney yes yesterday es Manager A J T Bettles stated during du ring the day that the new equipment would be rushed into camp and nd placed In commission at the earliest possible moment The mine is already alread equipped with a good hoist bolst and pumps the power for which has bas been supplied by a single boiler boller To sink the double compartment workings shaft to the level leel crosscut to the ledge and handle bandle the water has been a hard task and the boiler was all the time being crowded to the limit of its en ca Before the close down a few days ago the vein had been opened and fine ore was exposed but it was more than the theold theold old boiler could do to keep the pumps and aDd hoist running hence the determination thin tion to stop until additional equipment could be placed on the ground As soon as the new belier is set the old one will willbe De be overhauled and provided with new flues etc so 80 that it t may be hooked up and aDd made to do duty with the new one whenever necessary and a means of changIng off when repairs are needed WIth the power in apple pie order and the machIne drills at work it will not be long tm tIll the Hannapah is making a anoise anoise noise in the country east of o Tonopah J |