Show equipping Eq upping big holden dwinel A carload of lumber to be used in constructing a flume through the big holden tunnel arrived this week and the carpenters will at once commence I 1 the work of putting this flume in place fhe the big electric pumps which have been ordered for the centennial eureka mine will be used in lifting the matel ahei atei to a tank upon the them le lev el and the water will A ill then run fro from in this tank through h the lumber flume in the tunnel to the surface 1 A portion of the electrical equip I 1 ment merit for the new tunnel has also ar rived and banow is now being put in position |