Show getting ready to drill material tor the first rig to be put in by the virgin dome oil co Is partly on the ground on purga tory plat and the rest Is being hauled from lund the rig Is one of the heaviest ever put up in any country says W J graham the stem alone weighing 2600 pound the transformer ordered through the dixie power co will be shipped at st louis on the dinst and all other electric material at the same time the dixie power co has surveyed the pole line which will be completed by the time transformer arrives mr graham bays the new road wade to the fiat la a feic road hagh ly creditable to john H cuttaia Cot taia and the best work tor the money expend ed he has ever seen mr jack bennett an old pennsyl Pe ansyl oil miner has arrived here from california to take charge of the and will le with alio cotti pany |