Show NEW llEW PUMPS INSPECTED BY DY CANAL OFFICIALS City Engineer Kelsey and antI a number So o ot Interested citizens yesterday accompanied the presidents and directors of ot the canal companies on a visit of or In- In pe of or the new pumps that have been installed at Utah lake to Increase the flow of or the Jordan river rl Two of at the four pumps are arc alread already working and throwing gallons of at water a which la It considered more than enough to solve salvo the water problem for this season 4 third pump Is In course of oC erection and aDd the fourth Is on n Its Us way here from r S Ban n Francisco The Thu channel leading t 1 from t the lake to the pumps is being enlarged so 50 that all four tour can be run at tull i uli capacity when occasion dern The pumping plant will cost when complete t |