Show WORK ON BAMBERGER ROAD Evidence That line Will Reach Og Ogden Ogden den tien Early in the Summer Activity Is everywhere in evidence along the line of the Salt Lake Ogden railway south of this city and the Indica Indications Indications Indications are that by the early summer the theline theline line will be completed into Ogden Chief Engineer E A Vail has returned from the east where he went on business con connected connected connected with the construction of the bridge across the Weber Taber river This structure will III be built of comet and steel The abutments will be of stone and cement and the cement work will be carried on out across a portion of the tho river Across the center of the stream three steel gir sir girders girders ders will form the bed for the bridge Mr Vail Vall ordered the necessary material while east The contract for the abut abutment abutment ment merit work was let some time ago The additional construction work will be done by the railroad company Another consignment of ties is expected In a few days and then the will be resumed Gangs are at work at atthe atthe atthe the present time ballasting east from Farmington to the present end of the theline theline theline line The big steam shovel shoel purchased by Mr Bamberger last year is being used where the gravel Is being obtained A grading outfit is at work on the Sand SandRidge SandRidge SandRidge Ridge The cut made on the Sand Ridge at the point where the railroad crosses the Riverdale road Is now finished This cut Is twentythree feet deep The over overhead overhead overhead head crossing for the wagon road is be being beIng being ing built across It Along the bridge will wilt run a cement conduit to carry the waters of the west branch of the Davis and We Ve Weber Weber ber county count canal used for irrigation pur purposes purPOSES purposes poses The work on the proposed new county highway leading to this overhead bridge was stopped last Jast month by the commencement of Injunction proceedings by Christena Hunter and others A hear hearing hearIng ing log on this matter has been called for Saturday in the district court after which time It is expected the work will be com corn completed completed The purpose of the overhead bridge and the change In the county road is to avoid a dangerous crossing at the I point where the road emerges from the deep cut |