Show city water flow Is considerably increased by new 60 gal well A 60 gallon per minute well was brought la in monday at the city well farm carm west of town when the drill penetrated some twenty feet into a ot of water bearing sand at a depth of feet the new well Is located to the north of the other wells and la is the second well to b ba diffley by wm win wall since he started some six weeks ago however it was decided to drill farther through the hard formation below the water sand in an effort to explore the deeper sands the flow of water through the tour four inch casing has been sufficient to keep the hole dea aed out so that it has not been necessary to bale it it Is felt that a much larger flow of water katr mat be secured at a greater depth the water main from the wells to cement reservoir above town was taken out at the crossing of the dry gulch during the run off of last weeks storms and has now been repaired |