OCR Text |
Show Oil News Drilling at the Bluebell Unit No. 1 well (Monarch) located in center of the SWV4 NEV4. Sec. 6-1S-2W is progressing at a total to-tal depth of 9891 feet. Preparations Prepara-tions are being made to take a drill stem test. A core was taken between 9768-9818 feet, recovering 8 ft. gray oil shale, 19 ft. sandstone and siltstone, 20 ft. shale, 2 ft. sandstone and 1 ft. limestone. Coring again at 9818-27 ft, the crew recovered 8 in. limestone, 14 in. sandstone, 3 ft. siltstone, 8 in, sandstone, 6 in- conglomerate, conglom-erate, 3 ft. sandstone. A core at 9834-71 ft. recovered 4 ft. sandstone; a core at 9834-71 9834-71 ft, produced 37 ft. interbed-ded interbed-ded sandstone and shale; and a core at 9871-91 ft. recovered 20 ft of unclassified substance. Total depth at the Jack A. Burnett No. 1 well on Strawberry, Straw-berry, located in the SWV4SWV4 Sec. 34-4S-11W, is 4716 ft. The crew is reaming at 4712 feet to take a drill stem test. They cored at 4709-16 ft, recovering 2 ft sand, fractured. |