OCR Text |
Show ! 2S Newa The following summary of oil well drilling activities for the week ending Jan. 4, 1955 has been released by the Scouting Division Di-vision of Carter Oil Co.: Rosalyn R. Leonard, No. 1 (Located (Lo-cated NE SE, Sec. 19, 8 S, 25 E) Location staked Dec. 27, 1954. Road and location completed. Soliciting So-liciting contractors' bids. Bluebell Unit No. 2 (Located SW NW, Sec. 3, 1 S., 2 W., Perforating and testing. Plugged back total depth 8625 feet. Swabbed Swab-bed down; swabbed 1 barrel of fluid per hour for 6 hours, which was 6 mud, 3 water, 8 basic sediment, 83 high pour point oil; gas volume 62,000 cubic feet per day; ran 7 inch casing scraper; set production packer at 8566-70 feet; ran 2V2 inch tubing; perforated 8588-93 feet, perforated perforat-ed zone 8585-96 feet with 3 bullets bul-lets per foot and 3-80 gram ooen 1 hole jst shots per foot; set retainer re-tainer at 8526-8530 feet; acidized with 350 gallons of mud acid and stratafractured with 1500 gallons of treatment; through perforations at 8509-13 feet; swabbing indicated indicat-ed communication between perforations; per-forations; pulled tubing; ran tubing tub-ing back and set bottom retainer at 8492 feet; swabbing approximately approxi-mately 3 barrels per hour; (last grindout, 6 mud and gel, 29 water, 16 emulsion, 49 oil); continuing to test. Larsen State No. 1 (Located NE NW, Sec. 2, 20 S, 24 E) Set 10 inch casing at 252 feet with 125 sacks of cement. Drilling be-j be-j low 500 feet. |