OCR Text |
Show IS Mews Ute Tribal "B" No. 1 (located near Roosevelt in NE SW, Sec. 20-1S-1E) A core between 9900-57 ft. recovered 32 feel. Ran Schlumberger, total depth 9954 feet. Crews preparing to run casing. Rosemary Lloyd No. 1 (Roos-avelt (Roos-avelt Stepout Well located in NW SW, Sec. 24-1S-1E) Crews cleaned out to 9330 feet, conditioned condi-tioned mud. Drilled to 9330, mud became very highly cut; with oil from formation. Drilled ' cement plug and cleaned out to old total depth of 9677 feet. Crews are preparing to core. Ute Tribal No. 3 (Roosevelt Stepout well located in St in,, Sec. 28-1S-1E) Road complete. Digging reserve pit and waiting on rig. Willis Moon No. 1 (Duchesna Wildcat No. 2, located in SE SE, Sec. 13-4S-4W) Total depth 1052. Crews repairing rig. Duchesne Ute Tribal No. 2, (located in SE NW, Sec. 16-4S-4W) Ran Schlumberger to 8002 feet. Drilling at 8126 feet. Waiting on rotary tools. Willowcrook No. 1 (Wildcat well located in NE SW. Sec. 21-11S-21E) A drill-stem test at 8300-8542 feet, open 5V4 hours, ad gas to the surface in 2 hours with a good blow throughout; recovered 443 feet of gas-cut mud. A core between 8491-8542 feet, recovered 51 feet; a core between 8582-8682 feet recovered recov-ered 100 feet, and a core between be-tween 8683-8755 feet, recovered 70 feet. A drill-stem test at 8622-8755 feet, open 3 hours, had gas to the surface in 2 hourr, 10 minutes, with a good initial blow, decreasing to a very weak blow at end of test. Recovered 90 feet of slightly gas-cut mud Crews are coring at 8917 feet. Canyon - Government No. 1 (Jack Canyon wildcat well, located lo-cated in SW NE, Sec. 13-12S-14E) Total depth 2285 feet. Crews moving in and rigging up new draw works and motors. |