Show Past year costs Shown for at Conservation practices applied by of the Uintah Basin Soil Conservation District the past year are estimated to have cost for groups of irrigation reports C. chairman of the board of These conservation as itemized on the District's annual show lineal feet of canal lining was installed as a cost of 12 miles of ditch construction cost 25 major structures cost and 3 Irrigation reservoirs were built at a cost of Channel improvement with no cost was listed on the report as lineal |