Show Duchesne Legion Improves Home facilities Much progress has been made the past fall and this winter toward completion of an addition to the American Legion Hall at reports Commander W. H. The addition to the frame building will be stuccoed on the as well as the old portion of the Construction on the addition has progressed to the point where electrical wiring is being done on the Troy Bailey is in charge of this- wiring A stove has set up in the building for the comfort of the Floor of the addition is cement At a later it is planned to install a floor The roof is of composition Another change in the existing structure is removal of the front windows which will be used in the rear then plate glass will be placed in the building The addition will provide space for a two rest rooms and locked storage Much of the materials used in the construction project was salvaged from a service station in Duchesne which the Legionnaires helped tear down to make way for a modern Jack Legionnaire and city is supervisor for the building |