Show Golden stairs Road job Nearly finished A mile Improvement project on the Golden Stairs road in western Duchesne County is nearly completed and is being opened part time for Ernest J. resident engineer at Duchesne for the Utah State Road reports this grading and surfacing project is more than 95 per cent It extends the improved road to Tabiona and is the route on which another Utah State Road Commission project has been underway this summer of a reinforced concrete bridge to span the Duchesne River near Tabiona The construction project was commenced April 9 by L. A. Young Construction of Richfield Vernal Sand and Gravel of Contract time allowance for the project was working A flush coat of expected to be completed on the stretch of new road this Length of the project includes road-building on both sides of the new bridge which was built under contract by Max Jones Construction of This bridge is 75 feet long and 26 feet according to Ed Carman of project inspector for the Utah State Road |