Show Part Of School Job Rejected By School Board A pre acceptance inspection of the Tabiona School building project by school officials has resulted in the rejection of part of the remodeled construction of the reports Rowan C. Stutz of the Duchesne County School Officials of the Utah State Building Board and Utah State Board of Education have concurred in the action of the local school board in rejecting the ceramic tiLe work in one dressing-shower room and two of the rest rooms at the Tabiona according to the report from the These school officials have requested the Fred M Reynolds of to proceed with replacements of the tile work which the inspectors classed as unacceptable because of por states B. A. Jacoby of school board president A Sub Contract Stutz explains that this unsatisfactory workmanship is in the part of the remodeled section of the building and was one of the sub contracted construction Acceptance of the more than building project by the school is pending the replacement of this tile and completion of several minor construction jobs now unfinished in the according to The Tabiona School project commenced last May with a state emergency building fund allocation of calls for three new two new rest roms and heating plus extensive remodeling to the existing separation of the school into the elementary and high school reports |