Show escalante farmers build stream bank banh protection in wash approximately feet of stream bank aloag alvey wash on the leo wilson fa farm rm near Ese escalante alanto has been completed it la Is announced by josiah chairman of the Esc escalante escalanti alanto river soil conservation district planned by soil conservation service e technicians and au supervised e d by J james ames M gatherum work unit conservationist this revetment will protect an irrigation canal which has been r repeatedly damaged by flash hoods floods six hundred feet of one inch cable was anchored securely to the two banks on a curvo curve with intermediate anchors feet a part apart slack locust trees with the normal branches and lollage foliage left in ia tact were fastened to the cable with the butt end of the trees pointed upstream by means of heavy wiring nylah with four strands in three different places mr air reports that the distri etis Is planning to purchase additional cable from mines in the vicinity of price to assist other farmer district cooperators in his district in their stream bank jobs |