Show work starts on industrial plant r under way to lav corner 1 stone at early date gravel B az inz ins hauled for Youn foundation dation gravel Grai ial hauling commenced during the week in prepa preparation ratio U tor for putting in the foundation tor for A 1 building in which it is proposed to manufacture leroy A wilsons Wll Wil sons corn bained unit designed to heat air condition refrigerate and electrify homes the site selected tor for the enterprise is the L J adams farm about three miles west of here the building when completed will be about 60 by feet though only part of it may be erected at this time mr air El Ll ackner who Is interested with and is representing mr wilson here is making plans for a celebration le in connection with the laying of a corner sto stone ne for the building in the near future possibly next week interested persons person from the northern pirt part of the state including members of the board ot of directors 0 of f the utah steel corporation are expected to be here tor for the occasion which will be set to suit their convenience in the meantime the local committee is taking leases with options to purchase on a large acreage of land required as a consideration tor for locating the industry here and are still driving for the balance of the cash subscription approximately has been pledged to date |