Show WORK discontinued ON CANYON ROAD york work on the construction ot of the piece ece 0 of road in parowan carowan canyon between the first and second left hand canyons was discontinued during the week the men and teams were laid oft off entirely and the power shovel alovel and trucks will be used to finish the grade and possibly the graveling As the machinery available avail able right now work was postponed until it is when the work starter started it was thought that all the work would be done by men and teams but it was waa later decided to use machinery |