Show TO contractors sealed bids will be received by tile the dundei signed up to 2 P M tuesday march larch afa 1929 at which time they will be opened tor for B a new digil school building at farolan ra Fa rowan utah the work will be let in three parts as follows 1 general contract exclusive of excavating this latter having leen been let under Be separate parate contract 2 electric wiring 3 plumbing heating and ventilating ti plans and specifications tor for the above prepared by cannon and fetzer architects will le available to bidders at their office templeton BuL balding Bu iding ding salt lake city utah on and after thursday february 14 1929 also at the office of the un del signed A cash deposit will be required for each bet act of plans and specifications given out as aa follows for general contract tor for plumbing and heating tor for electric wiring S lid ild deposit will be returned on return of the drawings and apeci specifications in good order provided the one securing them has submitted a bid in proper form each bid must be accompanied by a certified check payable to the un det signed for not less than aper cent of the amount thereof said amount to le forfeited it the bid accompanying compa nying it is accepted and the bidder then falls fails to inter into the contract or to furnish the bond as required by law contract and bond forms forma may be seen at the office of 0 the architect time for completion will be an element in determining the award the right Is reserved to reject any and all bids BOARD OP OF EDUCATION iron county school district by dr M f J macfarlane pres prea and janet rollo clerk cedar city utah feb 12 1929 feb 13 27 |