Show BUILDING HOTEL HOT AT ersa HAVE FRAME UP FOR FOB MAIN BUILDING WILL INSTALL OWN LIGHTS ETC mr isaac lemmon came down from the mammoth the last of the week after spending about a month working on the hotel which he and his son thomas are erecting within a stones antones throw of the cedar breaks in which is locally known as the ollerton flat mr mf lemmon states that in addition to one of the smaller buildings which will probably be used for sleeping aparto apartment they have the frame for the ma main building baiad up r row 0 w and will complete it the he first thing inthe spring so it will be ready for the accommodations of tourists next summer according to mr lemmon they anticipate installing their own electric plant as well as a pumping outfit to pump their water into a large tank for culinary culi nery purposes they have a splendid location and should do a good business next season reason |