Show steg 4 THE ONTARIO lib liban ln t nt alio A lidit lo 10 alie mine it the time infuses new life and acner gy into the man who sees tho improvements prove ments being pushed foroud to completion and the carpe borce of men at work about in the and on the new works alone 16 add to the coil wood stone and ore weon aro constantly ai living and 14 SHIFT SO 1 work continues about as usual i smell apice of men being it tween all ohp level aiom the do n to the lev el 14 2 a foice of dpn are it iha iloner the wea drift where alio ledge ii between ho and six dept vido ind i for the entire width over pei ton at the tho ledge which was i few weeks and showed 70 ore in the face 13 about six felti tilde is fu as it cu be seen winch u foi a distinct cc of about alint feet along tho ft which is eastward on the ein the 01 e in this level looks even better than on tho level aboe and wall dolors hoffher insider to show how the dip of the vein 13 it is only to difo that the crosscut at tl e cut abe leape within a foot it would be cut aiom mido on leval yet been cut but the accent is within a few feet of it it will net le run in to however until the mammoth knowles pump it in place ready tor kumets sinking foi the will lo 10 in about a week or ten days oie is at piment aping iping slurped from the mino to abo mill at ano rato of lichty tons a day 01 tons moia than abo mill is consuming ihn is done to get a carpe supply into the mill before had ft oather come on so thit nf shut down u ay bo the gerade for the new is completed the exception of the pits aoi A stone wall deot and 12 feet inch 13 being elected on the upper side of alie to protect them in cac the binl should cae iho shaft H three the v hems 45 feet in the clear and feel ahe has now a depth of 90 feet wl lie an upraise to connect with it aiom the union tunnel is now up 35 feet leav ing a distance be them of about 10 deot he total depth to the tunnel baini feet the connection between the two lull bs made next week TUE for the new dail rand beinar got in readiness for tuft mine about ninety tons have been the fallows frame has also from ti buckee u which 1 being run aiom below the mill to tap the mine at a depth of GOO atte it is estimated will coit the company in the neighborhood of it still low ever inako a savin in the cost of pum pinc as tho water will ihen have to be raided up to alie GOO lei el 1 ho thus affected will pay for the tunnel in eai giuse I 1 the bullion produced from the nisi of jamar to the present ahmo hmo wa over 1 daoro thain was produced m the anic titas br am other mine in america tho next below acin tho standard Stan daid of bodie cal it 13 a fact that the ontario produced more thin the en tu camp of bulte in run autto so pram before the public as a mining |