Show Pipe To Br Bring g Natural Gas GasTo GasTo GasTo To Local Area I W Washington The of a a. I pipe line which will bring pat pat- nat natural ural gas to many Utah Counties has been approved by the Federal Federal Fed lect eral Power Commission Senator Frank E E. Moss D Utah announced an announced announced an- an Wednesday Senator Mom Moss said The Federal Federal Federal Fed Fed- eral Powe Power Commission has issued is issued issued is- is sued the nese ary order to permit permit permit per per- mit Colorado Interstate Gas com COm- company COmpany company pany to construct a from Rock Springs Wyo to a point near Provo and El EI Paso Natural Natural Natural Nat Nat- ural Gas to build a aline aline line from there to too the Nevada- Nevada Call California Cornia border near Las Vegas This means miles of 34 Inch steel pipe line lInc most of ot it In Utah The Facilities will wUl Interstate some 99 million and andEl andEl El EI Paso Natural gas more than 58 million I 1 have been assured by of officials officials ot- ot of ot El EI Paso that it is their firm policy polley tp make gas available to a any n y territory through which their lines Une pass El Paso however does not dis distribute distribute dis- dis tribute systems for Cor any Utah communities to bo be served Final l location of the main line Une will depend upon terrain to be covered and circumstances In involved holved in securing rights of at way The i The commissions commission's order provides provides provides pro pro- vides for c completion of lines Unes withIn within with with- in 18 months Opponents Opponent's however however however how how- ever may file for a rehearing and if this Is denied It may go goto goto goto to court It is therefore possible that the th starting date may be put oft off tf until late 1961 r w 1 i ELIZABETH B B. B |