OCR Text |
Show LEGAL NOTICES j NOTICE OF INTENTION. N dice Is hereby glen by tne hoard ol commissioners of Ocden City. Utah, of the Intention of said board of commissioners to make the following described improvement, improve-ment, to wit. To create "Fv nvenuo b:-tween b:-tween .Twenty fourth sireot and the south city limits of Ogden City, Utah, as a paving pav-ing district and to pave the roadway therein with Portland cement concrete pavement twenty feet In width, also to build culvi rts, irrigation and drainage systems, and to construct private water rervlce connections from the main to the curb line at tho expense of the Indl vidual owners opposite the lot? or parts of lots or houses not now supplied with such connections; The above homed work shall in.ludo the necessary grading therefor and all other work necessary to complete the whole in a proper manner according to the plans, specifications and profiles on file in the ol Hi of ih. i ll cnrlniei . and : to defray the whole of tho cost and ex penso of tho nbuttor's portion thereof by B levy of a special tux to be assessed upon tho lots or pieces of ground within 1 the following described district, being tho district to he affected or benefited by such improvement, namely "All the lanj I Ing between tho outer boundary lines of said street and a line drriwn fifty feet back from and parallel to said outer boun dary lines on both sides of "F" avenue between Twenty fourth street and tho south city limits of Ogden City. Utah, being be-ing Lots 1 to 12 Inclusive, Block 8 Brooklyn Brook-lyn addition; Lots 1 to 12 Inclusive, Block 9 Brooklyn addition: Lots 1 to 12 Inclusive. In-clusive. Block 10. Brooklyn addition; I.ots 1 to 5 Inclusive. Block 11, Brookhn addl Hon Lots 1 to 3 Inclusive Block 12. Brookhn addition. Lots I 2 31 and 32 Block 13. Brooklyn addition; Lota 1, 2 31 !nnd 32. Block 14, Brooklyn addition, Lots l 2 31 and 32. Block 15. Brooklyn addl Hon and Lot 12. Block 14. West Ugdcn addition, all In Ogden City survey. The estimated cost of each water con neetlon Is $50.00. The estimated cost ns given heiow does . not Include the cost of constructing prl ato water service connections, which .costs arc to be assessed against the prop erty benefited In addition to the regular assessment. The total cost of said Improvement Is estimated at $12,930 All protests or objections to such Im-provem. Im-provem. nt or to the carrying out of such 1 1. ni lon must be presented in writing signed by ihe owners of abutting property describing the SOmt together with the , number of abutting front feet and be filed itvlth the rltv recorder on or beforo the 7th day of July, 1'.'20. The board ot commissioners at Its first regular meeting thereafter, to-wlt, the Mb day of July, 1920, will consider the proposed pro-posed levy and hear and consider such protests and objections to said Improvement Improve-ment us shall have been made By order of tho board of commlslson-ers commlslson-ers of Ogden City, Utah Dated Juno 15. 1920 C. T. MOYFS. City Recorder. First publication June 16. 1920. Unat publication July 5 1020. Pub!i:.h. d In the (jeden Standard Kx:m Iner. P.i ing District No 13d |