OCR Text |
Show I: NEW WELLS BEING BORED CITY Commissioner Chris Flygare of the waterworks department reports that three of the five new wells to be drill -1 ed at Artesian Park have been com-1 pleted. The fourth is well under way, I . being 172 feet deep at the present time. The three wells areat a depth of 172 feet and give ecidence of a large supply of water. The fourth well will be drilled to a greater depth to investigate in-vestigate the possibilities of a new flow. Mr. Flygare states that a pipe line of 24-lnch wooden pipe will be constructed con-structed to the old wells, as they are quite a distance from those furnishing furnish-ing the present supply of water. |