OCR Text |
Show EXPENDING LARGE SUMS Pocatello. Nov 23 Another step in the construction work bore by the Short Line in preparation for the final bnullding of a depot was Instituted Insti-tuted yesterday when ground was broken for the new record building for the railroad here This Is to be a concrete building of one story. 40x 80 feet In size, and will be large enough to preserve all the records of the Oregon Short Line for a great number of years. Conduits for all the wire lending to this building, as well as to the location of the now ' ! ! depot, have been laid during tho last few days. It Is confidently expected that announcement an-nouncement concerning the new depot will bo made before long Meanwhile the construction of the paint shops and other buildings, which Increased the work of the shops vitally, at a cost of WO 000 is advancing rapidly. Double, track lng Is new interlocking system went Into effect at the entrance of a 1428-toot 1428-toot tunnel between Fossil and Kem-merer Kem-merer which is too narrow for double dou-ble tracking. |