Show I I CULEBRA CUT IS ISNOW ISNOW NOW HALF COMPLETED Nov No cut at the tho of the tho Isthmus or of Panama was half haIC on Oc October tober 23 3 according to reports trOll Crom tile the zone At that time 29 cubic yards tImid beon excavated and a similar amount o of digging ro to be done ThIs gigantic cut will bo be nine miles lon long and will have Ime Imea havea a width of three hundred feet at the bottom which le he forty feet reet above sea level tile the normal level Icel of the tho vat wal waler vator or er being fixed at feet the sea lea Its Ils completion Is said to bo be assured within four years cars |