Show I DAM WILL CAUSE HIGHWAY CHANGES I The present road from east cast to Pocatello will ho be beI discontinued In the near future when whon construction work orle on the I American falls rail dam dom dam Is started ted according to E I E Kidder engi engI- engIneer engineer engineer neer or of o the th U S bureau ot of o roads In Ogden O den denA OgdenA A new ne road co six saw miles null III be constructed under federal aid to 10 connect with the present mile 26 stretch of oC gra el surfaced toad load between Hen rails Palls and Pocatello lIo Plans for Cor the new section out ot of American rails Palls are now b being considered by b the time bureau of ot roads fonds roads A section of ot road 1091 10 91 1 miles In length leneth out of ot Pocatello to toward American Falls will be paved If plans of ot citizens ns of ot the t two 0 cities mature A meeting was held at nt Pocatello on Wednesday night at which time limo tentative 0 plans Ians were outlined The They will Ill ask the coi gO eminent for tor 11 assistance |