OCR Text |
Show WORKING ON MANY NEW BUILDINGS The Kiesel building, on Wall avenue ave-nue and Twenty-fourth stroet, Is progressing pro-gressing rapidly, the brick masons hae reached tho second floor Work on the second concretee floor is in progress All the floors of tho building, build-ing, says Mr Kiesel, will bo constructed con-structed of concrete, ro-inforced with steel which makes bhem flro proof. The flooring is what iH known as the "Kahn system " The roof also will be fire proof In order to give ample room for the operation of the street can? on bhc corner abutting the Kiesel place, the building has been placed fiftocn feet insldo the original lines This space. In connection with tho addltonal room afforded by tho removal of the stairway stair-way from Wall avenue to the viaduct a little to tho west and constructing it so It will parallel bho iaduct will make it possible for the street car system to be operated and at the same time give room for other traffic. Soren Hanson has taken out a permit per-mit for the erection of a warehouse on Twentieth street, between Washington Wash-ington and Grant avenues, that will cost when completed in the neighborhood neighbor-hood of $2,100. Mrs. Edith Dee and Mrs. Lawrence Deo are building a residence on Washington avenue, between Fifteenth Fif-teenth and Sixteenth streets, that will cost ?8,000. rr. - |