Show WATER difficulties IN BIG SIX WELL OVERCOME vater water difficulties which lal at lar tar astel as tel the at tit tl big six well at moab for the past eix six week attics have liae been overcome ani ant drilling tan an now ie conti continue nuel 1 with a dr hole to the next pa say sard d on satur paturia Pa turia laa after the casing ha hal I 1 been set fiet the mu mul I 1 which wa nap usel in an to hut shut out the water it was thit the job hal ha I 1 been mate reful nsf ua ani an I 1 the water m ater was balled bailed out of tl it e well the new news that the auter lter trouble troubles are at an enl waa was received rec elied with much sat is faction by oilmen through out the tate and the completion at of the well at an early late ie Is now looked for A delay of several day days in resuming drilling wae as ansel by a breakdown break doAn saturday eN even ening inc after about eight feet of hole wo made foll following the baili bailing g out of the water abile alle chang ing I 1 lite its it wa was discovered dieco disc overe verel I 1 that the pin which kev the bit into the stem ha hal I 1 broken an ani I 1 the bit wae as I 1 anding by a threat this feces isatel tle t ing of A r pew rw w boxing which arrived to inv la at noon the etring string of tool tools will be jigged up poliy an ani I 1 drilling opera eions will again be under tinder way by fri da dav doab time times in leren dent |