Show MD GRAND JUNCTION organization IS I 1 INJURING T PRICE 1 I 1 at a 3 special me meeting etin a of the chain her of commerce called by president V C talbert saturday evening and which ai atten attended Ged by the full board of at director directors with two exceptions it was doted to build the six or beigh eight t miles of road beyond garmela to the top of 0 the tile ejk cliff divide and on ln hect with the road fro from ai the uintah batin which the ustah bisin people promised mr dir talbert the thea would build if grand junction would meet them ss sas the grand junction senti sent I 1 nel I 1 the umlah ahin people promised to build the line if grand junction would diver t all midland I 1 rail that way after an hour s spirited debate saturday evening the dint ors decided to promise to divent all tic that way may anch they could providing the road wa a good one 0 ne but they decad decided d it was us impossible e to got the route of the midland trail changed P F C mernell merriell midland trail road engineer stated that while alb he would like to see ste the uintah basin people get their share of the traffic the route of the midland trill could not riot be changed and lie would oppose any attempt to change chang eit it president tilbert then stated he would write the amah basin people to the effect that tle the grand junction chimber of commerce was willing to divent that ara way and grand 1 junction citizens would do 0 but that the mi midland adland trail organization would 1 not do so thia this has already been j done |