Show U P AT HENEFER NEXT TO BE eliminated surveys are being made for the straightening of the road from hen eter flats the end of the present seasons improvement to etho echo and this work will be started early next spring this project will include the tha construction of an overpass structure south ot of ll enefer over the union pacific railroad tracks to eliminate the present dangerous grade crossing at the foot of the hill at the eastern edge of He henefer with this overpass constructed the highway from ogden to will be entirely free of grade Eros crossings sings also next season will see sea the construction st of a new road from wasatch in echo canyon to the highway near evanston which will do away with two more dangerous grade crossings where several fatal and near fatal accidents have occurred this work will be carried on by the two states in cooperation with the federal bureau of public roads delayed somewhat by the rainy weather of the past two weeks the tha utah construction company contractors on the road improvement work between morgan and henefer are progressing satisfactorily on the construction the work will be completed this week and the work of placing gravel Is already under way the stretch of road from morgan to about one mile north of devils slide which includes the four narrow rock points heretofore so dangerous to traffic has been completed and oil treatment has been placed the remainder of the road from that PO point int to north of henefer will epe be I 1 completed except for f or thai the oiling next two weeks the oiling of this latter piece will not be undertaken until next year when it will be given treatment as soon as the weather will permit |