Show WORK ON COAL VILLES NEW COAL MINE IS progressing NICELY NICELY work on Coal villes now new mine which is being sunk by J don birch and richard redden in the south part of town is progressing very satisfactorily and at this time the slope Is some sixty feet and they are at present in a full fam face of coal crop droppings pIngs all of the old timers we have interview state that this mine Is going into some of the best coal that has ever been taken out any mine in summit county and it is anticipated that coal will be reached within the next 50 feet A double shift was started to work vork on the slope yesterday dad and six men are now employed in this work an elm electric pump with a capacity of pumping gallons a minute has been installed it is now pumping 50 gallons a minute but the full capacity of the pump apparently will not be needed as the water in the slope Is decreasing we are informed that as soon as coal Is encountered a now new shift will be put to work on the surface erecting a tipple and hoisting machinery dostall most all of the equipment necessary to handle a large output of coal has been ordered |