Show Building Work Stops Heat At Elem School The necessity of tearing out I part of the conduit pipe carrying carrying carrying carry carry- ing steam from the boiler to the elementary school left the students in the cold for the week The construction work i is on a new shop building located lo 10 Gated behind the Manti ManU High School Electric heaters are being used wherever possible to take the chill out of the air air Supt Jack Burr commented He noted noted noted no no- ted that the contractor hoped to have the line finished by next Monday The absence of heat and the presence of cold stormy weather Mond Monday y forced the closing of the Elementary School early |