Show overpass completed will be nucleus of highway it 1 I 6 the overpass west of delta has been completed and Is now ready tor for acceptance by the state road commission mr air osborne engineer in charge of this part of the state was in delta wednesday gathering data for the acceptance in the regu lar meeting ol 01 the state road corn cam mission the overpass was started in the late spring and a crew of men has ben on the joll 1 ever since the pro eject furnished a good deal of work to n en under the W P A and for the last period two shifts of men have been working each day the con tractors tor for tie the overpass are strong grant ot at provo V jq the overpass ov will now be the only 0 official grade crossing in delta and t 19 fi er or but ut thir will bi loii thid aha I 1 traffic routed over the pass or whether the cro crossings sings will be left op en but people allowed to cross only at their own risk the construction and the amount of money used to buy rights of way will run between 80 and 90 with the greater portion of it funds this pass will be a very important in ili k in the new highway when work is commenced on it and the pas was don ahead of the regular belied lie ile on the highway in older to be boady when the highway reaches here the roads have been con strutted ted from th pass in a Y one road going down thiu the fields and joining the oiled road at th the all allred d farm on the river and the other coing corig out past dassett a 9 to join the no raid ad at ahk bidge it ida |