Show II 1 II A 1 11 Campus Undergoes Many Changes To Accommodate Utes When nearly expected University of Utah students return to the campus this they'll find an renovated series of buildings and with projects being completed during the summer bv the buildings and grounds According to W. Kent buildings and grounds the postwar influx of enrollment has necessitated not only the usual summer cleanup and but the addition of re-shifting of parking and playground and extension of virtually all A heating plant which will increase the heating facilities on the campus by about horsepower is being moved from Camp and three buildings from Kearns will be moved to the campus to house a new book New Book Store The book store under present will be located directly east of the geology building between the two walks to the Annex and book store space now in the Park building will be used for Evans Additional Medical school fa- will be housed in three which will be moved from the former army testing grounds at Tooele The ore dressing laboratory has been moved from the razed building west of the garage to the new structure east of the Mineral Industries and the engineering department is moving welding laboratory facilities into the old Pharmacy Space When the Naval science department is squared away in its new quarters in the Naval Science the space occupied by the department in the Gym will be for use by the new School of Four Butler huts which have been obtained from the War Assets administration will be used to house a stage and scenery workshop for Kingsbury hall and for miscellaneous storage of equipment needed for the expansion Evans pointed For the first time in years the center circle road has been resurfaced with asphalt by the Utah state roads Temporary have been made on other and stadium village roads have been oil- The parking lot west of the stadium also has been Stadium Improvements In the where seating in the north end has been railings will be installed before the Ute football season according to The huge stage for the production will be dismantled in time for the 23 professional football game in the Landscaping will be completed behind the Medical around the Naval Science and around the Other landscaping problems removal of the old silver maples and other diseased trees on the The which with the ash trees fringe the main walks from the University st. have not responded well to simply don't grow in the soil here on the Evans pointed The trees will not be replaced until future campus needs are more Blighted Tree One large cherry tree was removed on recommendation of Walter P. professor of because it was feared that the with which it was infested would spread to other The blight could not be although all trees are treated and sprayed Evans A putting green will be completed south of the Stewart school playing field for use by gym Extension of utility lines will make more water and power facilities available to several The university will continue to occupy Fort Douglas properties on about the same level next year as according to Telephone Exchange Also to be completed is a new automatic telephone exchange for the which will be located in the old women's locker room in the Park But although the expansion program is important and time the department has a multitude of routine jobs which are taken in order of importance as analyzed by the president's physical plant control composed of Leon D. secretary and Paul assistant to the Siebert W. purchasing Evans and A. Kay university |