Show DELTA HIGH TO BE READY FOR SCHOOL YEAR Contractor T. T H. H Hays of at the Delta Delta Delto Del Del- ta to High School will have havo the building building build build- ing ready for tor occupancy by the opening openIng opening open open- ing of the school team this fall tall We made a visit to the school finding all the workmen busy in finishing fin fhi- up with every prospect of their work being thru on time Ume The Tho building as now built Is two stories a unit complete in itself but but one ono of three parts two more additions additions additions ad ad- to be placed to It As It now stands it consists of at a main building north and south Bouth with entrance on the north end and on the side A large hall runs run a through both up and down stairs Tho principals principal's offIce office ortIce off off- Ice Is next to the main entrance and adjoining that on the north is the science room which will be perfectly perfect perfect- ly ventilated and all gases and odors completely removed Adjoining that thatIs Is the science lecture room One hundred steel lockers are on each floor giving every pupil one for his or her needs There are two class rooms to tho the south of at the main entrance Maple floors throughout Upstairs is a teachers' teachers rest room the domestic art room for tor sewing and anda a fitting room adjoining with non- non windows windows There is a a lavo- lavo tory on each floor the one ono on on the first floor for the boys and one on the second floor for tor the girls On On the south class room and a lecture room Two stoves In the domestic science room and an electric stove Adjoining that room Is 18 a dining room The corps of teachers include a teacher of at mathematics from tram Michi- Michi Huish from the B. B Y Uon U U. on English and Elocution Miss Ambler Ambler Ambler Am Am- bler on Domestic Science and Art and nd A. A E. E Jacobson on manual traIn traIn- ing ng T There ere are fourteen teachers In n all aU in Delta The Tho High has two fifty tons of coal oal stored in the basement basement- a. a big boiler gives the heat which Is large enough for tor the the other two addition when built A water system sy tem replaces the former tank on top whose only virtue was that It would work best when least expected to to- to best about midnight and overflow everything Th This s underground water wa- wa I ter er pressure system will be a 1 gal tank and will wUl supply both bot the tho grade and the high schools Next will be J built ull the gym grm full standard size Immediately ba back k atthe of at the present unit Then a wing north and west another unit tl that t to take the tho and grades As the building Is now It is equipped for tor forthe forthe the and lOth grades and all teachers secured So that our needs at present seem to be nicely met as asfor asfor astor for tor as the grade The school census shows students enrolled but as we always exceed the census we will wUl surely have this year ear Trucks will wUl get the students from the South Tract and up as far faras faras faras as Sugarville nort north Parents will find the Delta Deita school well wen fitted to drill their children up to and including the grade and the faculty ask for tor liberal al support |