OCR Text |
Show Moffat Lets Third Contract, A Donvor dispatch says Orman and Crook of Peublo 1 nvo bcon awardod the contract for grading tho roadbed of the Moffat lino from Arrowhead to Hot Sulphur Springs, a distance ot about twenty-threo miles. Tho cost will be about 300.000. About 600 mon will be put to work within a wcok Chlof Engineer En-gineer Sumner thinks tho grading will ho completed long beforo tho tlmo limit, lim-it, June 1 noxt. Tho beginning of this work will mean thnt tho Moffat road is soon to bo over tho hard places. |