Show OUTLET TUNNEL FOR FORTHE THE SHOSHONE DAM t Washington glon July JuT 25 Thes The of ot tho Interior lies has h authorized the reclamation reclamation rec rec- service to construct b by force account work an arm outlet tunnel in the time dear dam which Is la under larder Construction construction con con- In northern Wyoming tunnel will wil havo have a n cross section of ot eighty eight to square feet and a 0 length of feet tet It I Is 11 to be bo constructed through tho the rock around the limo right end of the tho dam feet above tho tIme lower Jower channel an and Its purpose will wil bo he to supplement the time present facilities for Cor controlling the tire level leel water In time the reservoir reservoir res res- in case of unusual floods The Tire cost of or the time work is estimated at between be lie- tween 15 and |