Show I BOARD Of PU PUBLiC WORKS WORKS' MEETING Meetings of the city board of public works are scheduled for Cor both the re remaining remaining remaining re- re Frida Friday evenings of the month May 21 1 and May 28 At tho the first of these meetings there Is little of an Important Important Important Im Im- Im- Im character to como come before the board boardS except possibly some estimates Tho The meeting of Ma May 28 8 8 however will bring up some Important work as bids are to be opened on that night for Cor soy sev eral big contracts The most extensive of these thesa Is that 4 for the resurfacing resurfacing- with asphalt of I 4 Main street between South Temple and Fourth South streets and tho the placIng placing Ing ng of now curbs ant and gutters along this portion of the tho thoroughfare This work was held up b by the 1 public works board on account of the opinion of some of tho the members that lit It should not Include new v curbing but bul when tho the members of ot tho the board were called colled into session by Mayor J J. J S S. S Bransford and shown the situation they promptly advertised ad for bids on ou the work In addition to the Main street re- re paving the tho board will let contracts during the present month for the tho pay pay- pavIng paying ing of Third South street between West cst Temple an and Third West Yest streets and for tor tho the stone stono cross walks In various var var- ious parts of tho the city where needed this matter having been laid over with the tho Main 1 street Improvement and ad ad- ad at the same Iame time |