Show GRAND CANYON POWER POMER COMPANY WANTS WATER Will Pay Largest Single Fee of Its Kind in the State The Grand Canyon Power company through 1 W. W B. B Searl of or Provo has applied applied ap ap- ap- ap plied to tho time state engineer r for or 2000 second feet of oC water to be taken from Crom the time Green Gleen river to bo ho used In running a plant capable cap of ot producing horsepower The fee reo paid paltI for tOl the time water rater right amounts t to 2000 anti and is tho the largest larg est single fee teo of tho time kind paid in th the state The company Is said to be lie backed by Eastern capital and has bas for tor its object the time building of ot an enormous tiara dam on the Green river feet teet below Its junction with coal creek In Emery count county By means of ot this title dam darn the time water will vilt be e bucked up tim for or 20 0 miles and arid s pressure secured to pf of or the tile operating oper of or a plant capable of ot supplying power all over tr the country within u LL radius of 10 iO 01 or CO GO miles s. s A diverting l channel will wilt bo be built an and the water will willbe willbo willbo bo be returned to Green river feet below below bolow be bo- low tho time darn dam |