Show OGDEN IS IMPROVING ITS SCHOOL BUILDINGS Special Service Se Republican Ogden Aug 11 Th The Tho High school chool Is undergoing a thorough ov overhauling 3 to bottom The largo large study from top bolom room has been heen divided into four Cour I rooms to lo accommodate classes tassos in manual training and oth other studies This will be an appreciated Improvement Improve wi the building wasso wasso was was' wasO mont ment as last year to necessitate the lie usi us I so O crowded as of the hallways sAt s I At the tho Pingree ree school a sanitary plant has been installed at an un estimated cs call call- mated co cost t of or 2000 This Is hi a as It In Includes Includes In- In much desired Improvement duties connection with wih the now sewerage sew sew- eora e system A n new w exit lies has also ora o been constructed on the west est side Ride which will provide more adequate protection wi In case of ot fire Ore There has ha been only one ono exit before |