Show TO 10 BEGIN PERA ON A ANEW JW NEW RAILROAD Proposed Gilmore and Pittsburg Pittsburg Pittsburg Pitts- Pitts burg Line to Be Built Without Delay The Tho nho proposed d Gilmore burg railroad to Salmon running City Cay Is fr from m Armstead Song Songs Songs' commencing to show n a realization of oC the Idea ot of these points Several Salt Lake Lako are Interested In this people s' s sone enterprise one of ot them yesterday 1 and ter from tile the received a letter let let- pany at Pittsburg Pa advising ot of the corn Com ever every effort is 18 being extended that toward the completion or of this project that contractors and and bids arc being were vere tiled tUell on the grOund Local railroad men who travel this territory for tor the information are responsible that there thero number ot of contractors are aro a poInts in 11 the tho from different st Et on 01 the tho site o ot th the proposed roadway at the pr present time and that they bellevo e that within tho the next two years trains will be bo running on ou the tho line Besides the direct lino line a n spur Is contemplated contemplated con con- from Junction City to the tho Gilmore mines a distance of ot IS 18 miles mUes and from present plans trains will be bo running to the mines within the tho present pres pres- ent cat years ears rho Tho bids call for tor the contractors con con- contractors tractors to be on thi and read ready for operations not later than March larCh 1 1 However It is a general generall generally expressed belief bellet that this date will to be e. e changed as the tho severe weather has I Jut put the ground in such condition I that It twIll will bo be next to Impossible to make mako a a. definite The move about May lay 1 l. opinion is expressed by those who vho ought t know that there Is Undoubtedly Undoubtedly un Un- something behind the flue construction construction con con- of ot this road and that probabilities les are that it I is to be bei the a connecting link In some new system |